Complete refurbishment, from design to handover
Rockwell were the main design and PSCS contractor for Stryker’s 22,000 sq. ft. facility refurbishment project in Macroom, Co. Cork.
Rockwell successfully completed a refurbishment project for Stryker in Macroom, Cork, demonstrating expertise in designing complete systems and preparing tender documentation and drawings with our in house design team.
The project encompassed the supply and installation of HVAC systems, including AHUs, HRUs, air conditioning units, and chillers. Rockwell also handled the supply and installation of all ducting and inline equipment as per schedules and drawings, along with equipment, utility piping, pipework steel supports, and ductwork supports.
The project concluded with thorough walk-downs, system handover, attendance at commissioning, and a successful project handover to Stryker, showcasing Rockwell’s commitment to delivering high-quality refurbishment solutions.