A complex project of expansion within an existing facility
In 2022, Abbott Diagnostics sought to extend its production capacity through the addition of a new ISO 8 Fill & Finish cleanroom & packaging area within its existing operational footprint. The complex project demanded a proven team to lead it from start to finish. Rockwell were appointed to the role of the PSCS and main contractor and began with the demolition, strip out and enabling works.
Multi-package project
The project was multi-faceted and Rockwell brought the design from concept through detailed design phases, delivering all elements of construction, including ISO08 & ISO05 cleanroom package, mechanical services, HVAC and electrical services, building management and central temperature monitoring systems.
Directly contracted by Abbott, Rockwell successfully delivered the project on schedule in 2023.