Projects / Dell

Largescale, cutting-edge technology testing centre.

This project marks the initial phase of a larger expansion, involving the installation of a new chilled water farm to support cooling systems for the facility. The scope of work includes:

  • Installed a 5 MW chiller yard and chiller pump house as part of a chilled water system extension.
  • Designed and constructed a robust pipe bridge to support the distribution infrastructure.
  • Developed process cooling distribution pipework to efficiently cool server racks within the facility.
  • Installed >300 meters of 12” and 14” stainless steel chilled water distribution pipework.